Apex Peakway

 

Apex Peakway

The Apex Peakway is a six-mile loop roadway around downtown Apex with two sections remaining for completion.

The remaining section to the east would connect NC 55 to Center Street partly along the existing alignment of Schieffelin Road. The remaining section to the west would cross the CSX railroad and South Salem Street with a grade separation have a loop road connecting to South Salem Street. Both of the remaining sections are currently included in long range plans but not funded. 

The entire loop is eventually planned for widening to a four-lane divided roadway. Existing sections with higher levels of traffic congestion will be widened as needed when funding is available.